[BLAST_SHIFTS] Shift summary 08/02/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Aug 02 2004 - 16:55:42 EDT


Operator: akdogan

The mojority of this shift has been devoted to the trigger studies.
Several simple trigger files have been created requiring single
forward TOF L/R hits, and data were taken for an hour for each
trigger in l1trig and l2trig (with WC).

We switched back to normal configuration at 16:27, at which will
continue to take polarizaed D2 data until 8-9pm.

Data crunching for the previous shift is going on; should be
completed in a few hours.

No major problem recorded. Beam was stable; injecting 150mA,
dumping at ~95mA with a lifetime of about 24min. The beam
polarization during this shift was 64+-1%.

Taylan