It was a smooth shift.
Kept taking polarized D2 data at almost 99% up-time.

o Fixed the compton problems. Re-alligned the laser. Got only about 180Hz/mA
  for the current beam tune. Beam polarization for the last 5 hours is 65.2 +- 3.6%.

o Checked the WC covers to make sure that they are off.

o WCs tripped only once. Also, had a few Crate1 crate-level trips, but not
  at a degree it may be considered a problem.

o Tancredi set up dblast13 and dblast14 such that they can, again, be used
  for data crunching. If you run out of spud, please use them, or try to find
  a free bud.

o CODA TS crate crashed at 9th run. Recovered by a soft-reboot.

o Runs taken: 7484-7497 (except 7488: coda crash). All are being crunched
  Spuds seems to be barely enough for keeping up with the data.