[BLAST_SHIFTS] Shift summary 05/15/2004 B (4-8)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun May 16 2004 - 08:54:35 EDT


Operators: shino ---- ----

Polarized deuterium data taking continued.

There are problems on the compton run number and the compton analyzer. I am waiting for Taylan's help.

There is only one hv trip in my entire shift.

The beam life time is strange and CCR is currently investigating with lower currents.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST