Operators: clasie akdogan ----
Smooth data taking.
Statistics:
- Runs taken: 5710-5714
- Runs crunched: up to 5711
- Runs crunching: 5712-5713
- Total charge: about 800 C
Problems:
- a few WC L14 trips
- HV (R2) crate tripped -> stuck in the "Restore in Progress"
state. Power-cycling (remotely) and BOOTing (./BOOT) solved
the problem. (Elog 21190)
Other:
- After the last tune, Compton laser was missing the beam
completely. LASER and collimator scans were performed to
optimize the backscatter rate. (Elog 21186)
Taylan
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST