Operators: egeis clasie yxiao
Runs 5691 5694-5697 taken... crunching has halted since the last 3 have not been transferred to the spuds... I may be at fault by accidently entering the command 'remove 1' (that would be me, eugene....) Hopefully, things will change so there is data ready for analysis come the morning...
I am happy to report, all WC L0-32 and R0-32 are running at nominal voltage 3850V. Beam injection was bumped up to 95 A at ~20:00.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST