[BLAST_SHIFTS] Shift summary

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Wed Jul 02 2003 - 16:00:52 EDT


Operators: clasie degrush

Hall was open to fix ion gauges.

Fan for BLAST cooling system broke. I believe BLAST can be run without it.

Hall is closing now for ion polarimeter studies.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST