[BLAST_TOF] gain matching

From: Peter Karpius (karpiusp@einstein.unh.edu)
Date: Wed Oct 23 2002 - 10:30:14 EDT


I assume that gain matching will be the priority tonight. We should be
able to make good progress for most of the tubes this evening.
Has anyone
taken a look at the runs I referenced in the shift summary? I think that
the left sector is almost there (again!).

***How high can I raise the voltage on these tubes?***

                                Pete

----------------------------------------------
Pete Karpius
Graduate Research Assistant
Nuclear Physics Group
University of New Hampshire
phone: (603)862-1220
FAX: (603)862-2998
email: karpiusp@einstein.unh.edu
http://pubpages.unh.edu/~pkarpius/homepage.htm
----------------------------------------------



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST