ABS was taken out this morning for SFT hall probe repair. The
blast frame is still open.
The hall will be closed shortly. The beam will be tuned with the
blast and holding fields OFF this evening. The blast frame will
be closed tomorrow morning, and, the snake will be filled. We'll
start to take unpol data with fields off in the afternoon, once
the snake is filled, until Wednesday.
ABS will be installed on Wednesday, and be ready Wednesday
evening.
So, the evening shift, and the overnight shift are -canceled-.
Taylan
-- ---=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=--- Taylan Akdogan Massachusetts Institute of Technology akdogan@mit.edu Department of Physics Phn:+1-617-258-0801 Laboratory for Nuclear Science Fax:+1-617-258-5440 Room 26-559 ---=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=---