[BLAST_SHIFTS] Shift summary 04/28/2005 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Apr 28 2005 - 08:58:17 EDT


Operator: gao

A relatively smooth shift overall. HV tripped off during run 15666 around 6:00 am. Called Taylan and reset the HVs. Noticed much higher WC scaler rates towards the end of Run 15665, called CCR. The beam tune was adjusted and the WC rates went back to normal, 5 minutes after run 15666 was started. HVs tripped again towards the end of run 15667 due to another bad fill.
Good runs: 15662- 15668