Operator: egeis
ABS was taken until ~16. The nozzle clogged and Genya led me through the motions. We are now running unpol and will eventually switch to empty according to genya. CCR was having RF problems and still having filling problems. The chief is now fiddling with a new button that regulates temperature in the LINAC. This could help but we'll see.
Other than that and about 4 broken pipes in the HV, things are smooth. Maybe the ethernet cables are a little loose in the D-tunnel, although I haven't had to make any trips.
Runs of ABS: 15523-15525 15527-15532
Runs of UNPOL: 15536