[BLAST_SHIFTS] Shift summary 04/21/2005 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Apr 21 2005 - 16:59:01 EDT


Operator: manouch

relatively smooth shift.
Once had to reboot the HV crates and the HV PC from the D-tunnel.
also 1/2 hour beam off to repair a flow switcch in the accelerator.
Good runs 15455-15461, 15465-15466
junk runs 15462-15464
auto crunching going



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST