ABS deut. data was taken all day.
Michael worked on the flasher signal and at one point asked for the beam to be dumped and the daq to be inhibited. This was only for a few minutes, but after inhibiting the daq, by pressing the green button, the daq was not inhibited after the beam came back and during injection. Runs 15141 and 15142 were affected.
Richard made a short access to the hall, and the HV GUI was rebooted during this shift.
The beam was injected to 225mA with 27min lifetime. CCR rebooted an IOC after the short access and the holding field was cycled.
The dilutions for the C shift on 05-04-10 are 0.649 +- 0.048 and 0.591 +- 0.031.