[BLAST_SHIFTS] Shift summary 04/08/2005 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Apr 08 2005 - 16:53:31 EDT


Operator: ajmasch

the first 2/3 or the shift went to recycling the abs nozzle and beam-tuning. data taking started back up at 2:30. fills are to 230mA and look quite smooth. everything is behaving. 500C/hr right now...

good runs:
15029-15030 15032