[BLAST_SHIFTS] Shift summary 04/02/2005 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat Apr 02 2005 - 08:40:34 EST


Operator: mcilhany

Smooth running shift. 225mA peak injection, 30 minute beam lifetimes.

Run 14819 apparently is not finished in the analysis yet. Someone should look into exactly what is wrong with it.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST