Operator: franklin
A good shift. Ran with 200 mA injection all night as ring was filling a bit slower than normal. Wire chambers ran at full voltage except L21 which was at 3825.
Took runs 14740-14747 (14743 is junk).
At 8:00, beam was turned off and the South Hall was opened for the scheduled maintenance shift. The primary tasks are regenerating the ABS nozzle and filling the Snakes.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST