[BLAST_SHIFTS] Shift summary 03/24/2005 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Mar 24 2005 - 06:52:20 EST


Operator: franklin

Ran smoothly up until 5:00 taking runs through 14616. At that point, a power failure took down the entire complex. Recovery is underway, but will be continuing for at least several more hours.