[BLAST_SHIFTS] Shift summary 03/13/2005 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Mar 13 2005 - 08:51:57 EST


Operator: yxiao

Quite smooth shift. Nothing important to report, except that some Epics channels were lost around 6:30am.

Beam injected at 100mA, and life time was around 29 min. WC scaler were less than 20. Cell temp. was stablized around 108 to 110 K.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST