Karen has been doing plenty of stairclimbing up and down into the D-tunnel. rtof1 fixed itself.
WC wires were exceedingly hot in left sector, they were fixed but now the right hand side looks terrible.

Signal to noise ratio in the superlayer 0 is about 8, 1 is nil, 2 is about 20, 3 is ~0.2, 4 about nil, 5 is about 20.

Left side looks reasonable but has a downgrade in its plateau towards the nonlinear rise.

Empty target started the morning for about 3 minutes, cosmics were intermittent while board problems were manipulated in the D-tunnel. I don't think any of the data is usable.

Situation between Israel and Palestine looks optimistic thanks in part to Egyptian diplomacy over the last few weeks.

Genya is ramping up to inject polarized D2. Whether detector has any ability to garner statistics is yet to be seen.