[BLAST_SHIFTS] Shift summary 12/14/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Tue Dec 14 2004 - 17:07:17 EST


Operator: alarcon

Snakes filled, beam back around 1:30 PM, 225 mA injection, running well with polarized hydrogen.

Runs 13225-13227



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST