[BLAST_SHIFTS] Shift summary 12/10/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Dec 10 2004 - 16:55:32 EST


Operator: adrian

Polarized H2 runs 13150-13153 taken. Crunching.
Around 11 AM BLAST power supply was turned off.
Runs 13154-13157 taken with no BLAST field in order to get straight tracks for the wire chambers (Doug).
Plan is to soon switch back to normal conditions (after about one million events).

Adrian



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST