Operator: zhangchi
beam came back before Wang left. but CCR had to lower fill current to 165 some time later. then beam was lost, then beam was back, then beam was lost again, then it is back again just now. (0:58). took 4 runs since 4pm this afternoon.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST