Generally smooth running.

Slight problem after the ninth run. Tried to avoid doing a setup by downloading a different configuration and then going back to l2trig but the following run was missing the WC data. Ended up doing a setup anyway but lost a lot of time.

Runs 13125-13128 13132

typically getting 470 C/hr