[BLAST_SHIFTS] Shift summary 11/16/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Tue Nov 16 2004 - 17:42:40 EST


Operator: hasell

Hall open to fill snakes.

Ran cosmics until 15:00 then got the beam back and switched to polarised H

Cosmic runs 12664-12665, 12667-12672

Pol H runs 12673-12675 12677



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST