[BLAST_SHIFTS] Shift summary 11/14/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Nov 14 2004 - 16:47:32 EST


Operator: shino

Up to around 1 pm when the cause of network problems was identified by
Barbara, the shift was busy trying to get the data taking continue.
Once the network switches were fixed, the data taking went quite
normal.

Good polarized hydrogen runs : 12601 12605-12612