[BLAST_SHIFTS] Shift summary 10/31/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Oct 31 2004 - 17:51:36 EST


Operator: tancredi

Continued ABS data but as ABS was losing intensitiy very rapidly (see
http://blast02.lns.mit.edu/elog/2004/10/31/30644.html ) decided to switch to
empty at around 10 am and started cycling nozzle.

Lost about 2 hours due to network problems. Hopefully they had been solved
now that barbara idenitifed a troublesome network switch. Tried to take
data in the meantime but roc got disconnected and could not reboot until
network came back

Now genya is starting He3 program. Plan is to go back to 32 deg hydrogen
for the night