[BLAST_SHIFTS] Shift summary 10/18/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Oct 18 2004 - 09:20:30 EDT


Operator: karpiusp

Smooth shift except for NC L3 downstream tripping. Investigation showed that it was not drawing current and the voltage was set to zero. Notifed MK via telecom

VPol results for Runs: 11980-11984
 L:0.489 +- 0.079 R:0.441 +- 0.064

where is my replacement?



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST