[BLAST_SHIFTS] Shift summary 10/16/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat Oct 16 2004 - 09:01:35 EDT


Operator: egeis

smoothest shift ever. no trips, no beam problems, no autocruncher failure, no HV hangs... nothing. oh... one 9th run coda hang.

runs: 11951 11952 11954-11958