[BLAST_SHIFTS] Shift summary 10/08/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Oct 08 2004 - 09:21:53 EDT


Operator: clasie

Quiet data taking until 6am when a power supply to one of the quads in the ring went down. People were called in to replace it. Beam was still down at the end of the shift.

At around 8am there was a slight power glitch and something beeped in the area of the counting bay near the spuds. It could be the AC as it turned on directly after the glitch. Connection to the spuds is ok, coda would prestart, Blast toroid is still energized but ligit is slowly increasing. ABS people are being contacted to see if a turbo has been powered down.