[BLAST_SHIFTS] Shift summary 10/06/2004 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Oct 07 2004 - 01:13:17 EDT


Operator: tancredi

Resumed production on polarized deuterium.

Iniitally a problem with the compton laser not helicity-flipping caused an
apparent 0 beam polarization (fixed by PK!) in run 11736
No further issue until around 12.30 Tx 5 crashes. Waiting for RF tech to fix
it. Meanwhile run 11742 keeps going with a very long fill..

Plan is to continue data taking on deuterium



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST