Operator: manouch
Relatively smooth shift. Beam lifetime very smooth and good, 24 min at 150 mA
LQ48 tripped in the ring once, lost 1/2 hour.
HV GUI window lost after a HV trip, found HV windows and controls in a strange state. Took a while to restore, lost about 1 hour.
Good runs 11565-11570.
The new run sheet with check marks on various critical systems is a good one. Hope people check every item on the check list for every run. I Suggest to add
to the sheet 2 more columns:
1) date column
2) experimenters initials colunm.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST