[BLAST_SHIFTS] Shift summary 09/10/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Sep 10 2004 - 08:45:52 EDT


Operator: ajmasch

fairly quiet shift. the rocs had to be hard-rebooted once. and, in the last hour or so, the beam has been having some problems. but other than that, a fairly smooth shift.

pol deut runs:
10990-10998



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST