Operator: karpiusp
Started shift with Bill F calling Doug about the poor spectrum in R WC's. Increased gas flow and per DH instructions and the WC spectrum looks a bit better a few hours later.
Around 0500 or so, LES1D started having problems and we have been down since. Helped out CCR for a while with this until DC & CV came in
Took runs: 10920-10921 10923
Pol Results:
04-09-06 B (last shift crunched) L:0.521 +- 0.062 R:0.555 +- 0.053 1.83kC