[BLAST_SHIFTS] Shift summary 09/06/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Sep 06 2004 - 08:54:24 EDT


Operator: nikolas

Beam problems cost 1hour of data taking. Otherwise smooth D2 Pol data.
Runs 10890-10898 taken. Crunching.
The Nozzle is freezing up. Time to warm up and switch to Unpol/empty is approaching. Monitor C1PGFS, consult with experts.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST