[BLAST_SHIFTS] Shift summary 09/01/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Wed Sep 01 2004 - 09:20:43 EDT


Operator: zwart

Some problems with the DAQ. Symptom is that most of the scalers are not counting. Doug stayed late to help. Called Karen who helped us track it down to a flaky state of the MLU in the CAMAC trigger crate. She talked talked us through reloading trigger and systems are up again ~4:45 AM.

The red needle hovers around 250 C on tape/hour

Junk runs 10696-10698
Good runs 10699 - 10704
            
Brian McA has noticed the beam position correlates with temperature in the hall. This could be a significant contributor to variability in the Compton backscatter rate.

                TZ



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST