[BLAST_SHIFTS] Shift summary 08/19/2004 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Aug 20 2004 - 00:49:29 EDT


Operator: nikolas

Polarized D2 data taking continued. Runs taken 10174-10189. Crunching.

Towards the beginning of the shift, the ABS Nozzle alarm went off indicating a failure of the corresponding ABS pump. Ernie talked to the CCR and the matter is temporarirly resolved. Ernie stated that even though he has a replacement he did not choose to use it before figuring out the details, maybe by tomorrow. The intensity seems to be at almost at the same level as before the failure, ligit at least is only 10% lower.