The wire chambers are available once again. Aaron and I changed the
wires in one of the cells connected to box L14 and it now appears to
hold HV at least as well as some of the other boxes in the left sector.
We will have to want for beam to determine whether or not it can hold
the nominal operating voltage, 3850 V, with beam.
Cheers,
Douglas
26-415 M.I.T.
Tel: +1 (617) 258-7199
77 Massachusetts Avenue Fax: +1 (617)
258-5440
Cambridge, MA 02139, USA E-mail:
hasell@mit.edu
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST