Operator: kohlm
Good ABS D2 runs 8198-8203 8207-8213 taken, crunching.
At the beginning of the shift until about 9pm, R24 tripped every 10 minutes or
so but became more silent thereafter.
The spin flipping is visible in the BQMs and sometimes causes HV tripoffs (besides the ever-returning-but-also-clearing ABS alarm)
/scratch/dblast07 became filled up during run 8197 (see elog). Cleared runs 7800-8100 after checking checksums.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST