[BLAST_SHIFTS] Shift summary 06/02/2004 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Jun 03 2004 - 01:46:00 EDT


Operator: adrian

Two hours into the shift an ABS (vacuum) power supply failed.
Called the experts (Genya, Nick, Vitaliy, Hauke, Ernie), Peter Binns came in and fixed it.
Runs 8058-8063 taken (ABS alarms all the time, last two runs surely had the ABS power supply problem before it was diagnosed).
Data taking resumed just before midnight. Runs 8064, 8066 taken after ABS was fixed. All above runs crunching.
For more info about the ABS problem, please see elog.

Adrian
Adrian