Adrian,
Thanks for your summary.
Two more projects, which Adrian and I will focus on after I finish
reconstruction code, are:
1) Determine time offset using cosmic ray
2) Swim the reconstructed track using proper B field mapping
Wang
On Wed, 26 May 2004, Adrian T Sindile wrote:
> Hi - just to summarize the BAT discussion of today...
> After the regular BLAST meeting and the three hour analysis meeting
> we had today, Wang, Chris and I got together and discussed the next steps
> for BAT analysis.
> Wang is finishing up the BAT reconstruction code and also looking at the
> preliminary BAT info. When the reconstruction code is ready (at some
> point next week) I will take that code and merge it into my tree data
> structure.
> Hopefully at that point we will start the big recrunching jobs people
> speak about - and after recrunching I will include BAT's info in my
> analysis to get Ge/Gm at higher Q2 on a regular basis.
>
> Adrian
>
> -------------------------------
> Adrian Sindile
> Research Assistant
> Nuclear Physics Group
> University of New Hampshire
> phone: (603)862-1691
> FAX: (603)862-2998
> email: asindile@alberti.unh.edu
> http://einstein.unh.edu/~adrian/
>
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST