Operator: nikolas
Polarized data taking continued afetr 1am. No significant problems except a 30min problem with the beam the CCR had to look into. Spin at 32 degrees.
Runs 7805-7816 taken. Crunching.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST