Operators: manouch ---- ----
Shift 1:-9:00
Relatively smooth data taking with unpol D2 target, ligit at 1x1o-7, Imax=100 mA
WR L14 frequently tripped at 3800V, reduced voltage to 3775, much better, may be because of unpol target is denser (molecules, instead of atoms) compared to ABS D2.
Good runs in this shift, 7350-51, 7353-7360, 7362-7364
junk runs 7352,7361, 7365-67
At around 7:10 the accelerator controls computer Locus hung, Ernie Bisson revived it, caused network interuption, had to reboot coda and rocL-start and rocR_start with Karens instructions. Lost about 1 hour.
Crunching runs up to 7363.
Also continued on backing up Spud6, upto tape 4, copy2
Manouchehr
Will keep runing
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST