[BLAST_SHIFTS] Shift summary 04/22/2004 E (16-20)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Apr 23 2004 - 01:08:12 EDT


Operators: clasie ---- ----

The storage cell was warming up for the first half of the shift until 10:15pm, and then was cooling down for the last half of the shift. Currently the cell temp is 111K and the unpol buffer system will be opened to flow into the cell soon. CCR has tuned the beam.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST