[BLAST_SHIFTS] Shift summary 04/16/2004 E (16-20)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Apr 16 2004 - 20:04:04 EDT


Operators: akdogan karpiusp tavi

Power glitch gave CCR some problems early on, and except for this and finding /home/daq/ full at one point (which we fixed) the shift went fine.

Although the top BQM read a bit high for much of the shift. Asked CCR to try to improve this.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST