[BLAST_SHIFTS] Shift summary 04/13/2004 B (4-8)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Wed Apr 14 2004 - 08:06:59 EDT


Operators: seely seely seely

shift was smooth. took polarized H data: runs 6567-6574 (count_charge gives total Q = 262 C)

trips were infrequent. had to ./BOOT the HV once: BATs voltages were correct.

put an asymmetry plot for last days runs (that have been crunched) in elog

js



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST