[BLAST_SHIFTS] Shift summary 04/13/2004 E (16-20)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Tue Apr 13 2004 - 21:24:07 EDT


Operators: kdow yxiao clasie

The BATs were gainmatched (again) using cosmic runs.

Taylan deleted runs 6000-6199 from /scratch/dblast07. He confirmed the data md5sums before deleting.

There were two transmitter crowbars when beam was back, which were fixed very quickly (in around 10min). Hauke called to say the nozzle temp was not being controlled, it had dropped to 64.4K. The controller was turned on and the nozzle temp is now 70K.

The beam was stopped for 2 hours during this shift for the trigger work, BATS gainmatching and the tour. Otherwise, we took polarized H data.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST