Operators: nikolas shino ----
this is a belated shift summary for the 0-4 shift:
network problems persisted from 0010 to 0610. Ernie was eventually able to clear up the [problem by replacing network switches etc.
No runs were taken in this 4 hour span.
Note that the convectron gauge on the polarized gas feed system reads higher, useually an indication that we a reclogging the nozzle...
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST