[BLAST_SHIFTS] Shift summary 03/26/2004 C (8-12)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Mar 26 2004 - 12:08:23 EST


Operators: karpiusp karpiusp karpiusp

Relatively smooth. Set L6 to 3800V at beginning of shift as it was tripping once every minute. Hall access by CCR to fix a fan on the south hall cooler.

Took runs through 5935. All crunching caught up.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST