Operators: akdogan ---- ----
Not so smooth shift. Nevertheless, took about 2.5 hours of clean data
out of 4 hours (12-4pm).
Statistics:
- Runs taken/taking: 5745-5750
- Runs crunched: up to 5748
- Runs crunching: 5749
- Total charge for useful data (5745->): ~600 C
Problems:
- Minor WC trips.
- CCR had a minor problem with transmission unit 6.
- The machine had problem with phase, re-phased in an hour. (Elog 21246)
- HV crate re-initialized from the database. (Elog 21247)
- Injection problem interrupted the beam for about an hour. (Elog 21255)
- Ligit pressure fluctuated for a few minutes. (Elog 21257)
- Coda hung once.
Taylan
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST