Operators: seely vziskin ----
smooth shift. took runs 5601-5609, crunching...
restarted CODA once.
set up a cosmics trigger for the BATs. in the (hopefully) unlikely event that the beam goes down for a long period of time (few hours), it could be useful to take data with this trigger for BATs gainmatching. so, for those on shift if we go down, just do the following:
load 'js_cosmicBAT.settings' trigger file.
'abort' on CODA screen, then configure with 'l1trig' (since l2trig requires WC hits - KD or TB: please advise if this seems necessary and sufficient), and start running. maybe call JS and/or BC if this happens.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST