[BLAST_SHIFTS] Shift summary 03/12/2004 E (16-20)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Mar 12 2004 - 20:33:31 EST


Operators: yxiao manouch ----

Smooth data taking, very few WC HV trips (mainly on WC L14). Took runs 5546-5551 (150K each). All good runs and being crunched.
wire chamber left scaler ~50 at 75 mA, left scaler=26
the new scaler to CCR single trigger rate =69
ABS target ok, and flipping, ligit=6E-8.
Manouchehr



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST